Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 9 results ...

Chan, S L (2001) Empirical tests to discern linkages between construction and other economic sectors in Singapore. Construction Management and Economics, 19(04), 355-63.

Cheung, S-O, Lam, T, Lueng, M and Wan, Y (2001) An analytical hierarchy process based procurement selection method. Construction Management and Economics, 19(04), 427-37.

Costantino, N, Pietroforte, R and Harnill, P (2001) Subcontracting in commercial and residential construction: an emperical investigation. Construction Management and Economics, 19(04), 439-47.

Fisher, T and Ranasinghe, M (2001) Culture and foreign companies' choice of entry mode: the case of the Singapore building and construction industry. Construction Management and Economics, 19(04), 343-53.

Isidore, L J, Back, W E and Fry, G T (2001) Integrated probabilistic schedules and estimates from project simulated data. Construction Management and Economics, 19(04), 417-26.

Manavazhi, M R and Xunzhi, Z (2001) Productivity oriented analysis of design revisions. Construction Management and Economics, 19(04), 379-91.

  • Type: Journal Article
  • Keywords: Design revisions;design process; design productivity
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190010017141
  • Abstract:

    This paper presents a structured, two-pronged approach to the development of a framework for assessing the severity of occurrence of design revisions and determining the causes of these revisions. The development of the framework involves the identification of a causal taxonomy consisting of categories of the causes of design revisions and the formalization of a set of indices for measuring and comparing the magnitudes of designer-times expended on design revisions. The framework could be used both as a diagnostic instrument to determine the health of the design phase and also as a forecasting tool for the estimation of designer resources required for a construction project. The framework was tested using data obtained from twelve building projects in China. The category that caused the maximum expenditure of designer time on design revisions in the building projects surveyed was found to be owner-initiated changes.

Marasini, R, Dawood, N and Hobbs, B (2001) Stockyard layout planning in precast concrete products industry: a case study and proposed framework. Construction Management and Economics, 19(04), 365-77.

Mochtar, K and Arditi, D (2001) Pricing strategy in the US construction industry. Construction Management and Economics, 19(04), 405-15.

Tam, C M, Fung, I W H and Chan, A P C (2001) Study of attitude changes in people after the implementation of a new safety management system: the supervision plan. Construction Management and Economics, 19(04), 393-403.